TORTILLAHALL - TRENDSPORT UBP & BRUMI ARCHITECTS FOR Ö.I.S.S. study of trends and hallstructures, tortilla hall proposal |
Page 1 Page 2 |
study The BRUMI ARCHITECTS tested various constructive variants and compared the resulting costs. Membrane hall, shed hall in wood construction, metallic construction with para-roof and the tortilla hall with transparent composite roof.
|
The study concluded that a trendsports hall of the measurement 25 x 50 m will cost less than 15 Mio. ATS (-> 1 Mio. $) This includes the sports equipment, heating system, lighting arrangement and sound devices, -so to say: ready for operation. Compared to the usual sporting halls (27 x 45 m plus secondary rooms, with development costs of about 45 Mio. ATS -> 3 Mio. $ ) the trendsports hall offers a good prize-feasibility balance. All USD Numbers are based on the exchange rate of 19/12/00 (1 $ = 15,39 ATS) |
![]() |
|
1. Wood - Shed Hall A timber work with a shed-roof topping. The light and air supply is enabled through the sheds. The exterior walls are readymade wood panelles. |
![]() |
|
2. Metal - ParaRoof Hall A steel construction with sandwich panelles at the exterior walls and a ParaRoof (two layers) with integrated lighting gaps. |
![]() |
|
3. Membrane - Air Hall The skin of the membrane hall is carried by air pressure. Three membrane layers with air heating and cooling devices. The membrane consists of enhanced (polyester) PVC. Doors and gates are canal locks. |
![]() |
tortilla hall 4. TORTILLA HALL A stainless steal construction with hardened wood panells and acoustic covering. The whole roof consists of compostie Carbonatepanells and sun covers placed beneath.